The Perfect Timing: When to Involve an AV Integrator in Your Project
- Bryce Stoner

- Jul 22
- 2 min read
Waiting until the drywall is up and the paint is dry to think about your audiovisual systems is a recipe for budget overruns, design compromises, and project delays. Whether you are planning an auditorium expansion, a boardroom update, or a complex corporate headquarters, timing is everything.
So, when exactly should you bring an AV integrator on board?
The short answer: As early as possible.
Understanding when to involve an AV integrator can help you avoid costly changes and keep the technology aligned with the rest of the project. Let’s break down exactly what an integrator brings to the table and when you should involve them during your project's lifecycle.
1. The Design Phase (Architectural & Schematic)
When:
Before blueprints are finalized and construction begins.
Why It Matters:
This is the golden window for AV integration. Bringing in your technology specialist early allows them to work directly with your architect and contractor to understand your daily workflows and structural requirements.
Avoid costly rework: They can design hidden wiring pathways, anticipate power drops, and adjust ceiling heights before walls are built.
Space and infrastructure: They evaluate sightlines, acoustics, and lighting, ensuring your desired displays and speakers actually fit the space.
2. The Procurement Phase
When:
After system design and engineering are mapped out.
Why It Matters:
High-quality AV equipment—such as digital signal processors, matrix switchers, or specialized video walls—often requires significant lead time to order and procure. Getting your integrator involved here ensures that all hardware is fully compatible, ordered ahead of schedule, and aligned with authorized distributors.
3. The Implementation Phase (Construction & Integration)
When:
During the "rough-in" stage of construction.
Why It Matters:
While it is ideal to engage an integrator before walls are built, you must keep them involved during the physical construction. During the rough-in stage, they will need to lay the groundwork for structured cabling, build equipment racks in their shop, and coordinate with electricians and HVAC technicians to prevent interference.
4. The Commissioning & Testing Phase
When:
Post-construction, prior to handing the space over to users.
Why It Matters:
An AV system involves much more than just mounting screens and plugging in cables. Integrators handle the complex network calibrations (like separating AV traffic from standard data traffic), DSP programming, and rigorous system testing. They ensure everything responds flawlessly.
The Risks of Waiting Too Long
What happens if you involve an AV integrator late in the game?
You risk:
Destroying aesthetic finishes: Cutting into custom woodwork or finished drywall to run cables.
Network incompatibilities: Forgetting to provision the right bandwidth or causing network traffic issues.
Budget bloat: Paying premium fees for last-minute expedited shipping and emergency labor.
A great AV integration team does more than just plug in gear; they act as a strategic partner to deliver reliable solutions that just work, empowering organizations to communicate seamlessly and perform at their best. em